Estimate, send, and approval
Start a project, build the estimate from your price book in phases, send it, and get it approved — by the customer online, or marked approved by you.
A project starts life as an estimate. You build it from your price book, split it into phases, and send it. When the customer approves, the estimate locks, the deposit goes out, and the project is ready to schedule.
1. Start a project
Open Projects and click New project.
In Search for Customer or Property, type the customer's name or address. Existing customers appear with one row per property (a customer with no property gets a No property yet row), then matching leads.
Pick a row. The project is created at once, named [customer]'s project, and opens in the estimate builder.
Picking a lead turns the lead into a customer and uses the lead's address as the property. A project always belongs to one customer and one property.
Rename the project by clicking its name at the top-left of the builder. ⋯ → Project details sets a Reference (shown in lists instead of the name, like Q-2041), a Customer PO, and the Property.
2. Build the estimate
The builder is a grid of line items on the left and the phases, payment schedule, and calculations on the right.

Add line items
Click Add line item. The picker opens on Add from the price book, with your categories in your own order, Saved bundles, and Search the price book. Each item shows Cost · Sell. Pick an item and set the quantity; Enter adds it and keeps the picker open. A bundle adds one line (Paver patio, installed · Bundle · 5 parts · 6 h labor). Items flagged Incomplete in the price book can still be added.
Can't find it? Type a name and choose Add "…" as a custom item, or click Custom item. Give it a Name, a Kind (Material, Labor, Equipment, Other), a Category, Unit, Quantity (or Hours for labor), Unit cost, Markup, and whether it's Taxable. A custom item lives on this estimate only and shows a Custom tag; Save to price book… in its row menu adds it to the catalog for next time.
Edit a line
Click a cell to change Qty, Unit cost, Markup, or Price. Price follows cost × markup until you type a price; then the row shows Price set by hand and the markup adjusts. Type a line total and the price per unit works itself out.
Each row's ⋯ menu offers Mark as optional (the customer ticks it on their page; see below), Taxable / Not taxable, Price from cost × markup, Move to phase, Save to price book… (custom items), and Remove line item. Tick several rows to move or remove them together. Drag the handle at the left of a row to reorder, or to move it into another phase.
A line whose cost is missing shows Missing cost in red: it counts as $0 cost, so your margin reads higher than it is. The send check points it out.
Phases
A phase is a chunk of the work with its own line items, team, and days. Click Add phase at the top. In the New phase window:
Name — Demo & base, Patio, Planting.
How it's billed — Fixed price (the price is the sum of its lines) or Time & materials (the crew's punched hours × a Rate per hour, plus the materials they use; add the Estimated hours so the estimate shows about 10 h).
Team plan — the Suggested team and Team size. They're optional; they drive the ~days on the phase and the suggestion in the Backlog.
Advanced… — the Work type (Hardscape, Planting, Drainage, Irrigation, Grading & seeding, Demo, Cleanup, Other), Sales tax on labor for a T&M phase (Company default, Taxed, or Not taxed), and a Note for the team that shows on their phase checklist.
Click Create. Lines you had ticked move into the new phase. Open a phase's settings again from the Phases list on the right, or from the phase row's menu (Phase settings, Move up, Move down, Delete phase). Deleting a phase asks whether to move its items to another phase or delete them.
Group by at the top of the grid switches between Phase (the default) and Category. An estimate with no named phases is one phase, All work.
Discount
Click Add discount in the Calculations panel. Choose Discount in Percent or Dollars, the amount, and what it Applies to (Whole estimate or one Phase…). The Public label (Returning customer, Neighbor referral) is what the customer reads. The window shows the margin after the discount against your target. One discount per estimate; it comes off before tax. After the customer signs, a price cut goes out as a credit on a change order instead.
Calculations
The Calculations panel keeps score as you build:
Budget hours — the labor hours across every phase.
Direct cost, Overhead, Break-even — your cost, the overhead your cost model adds, and the two together. Overhead and break-even show – until you set an overhead recovery % in Costs.
Margin (direct), or Fully loaded margin once overhead is set, against your Target. It turns red under target.
Discount, Pre-tax total, Tax (with the rate's label, like Tax IN 7%), and Total.
Click Details to see cost by Materials, Labor, Equipment, and Other, the Subtotal before discount, and what tax is Taxed on.
The Payment schedule panel shows how the fixed price will be split, from your default schedule, with the amount of each step. It's the schedule the customer will see; you can change it per project when you mark it approved (below).
3. Send for approval
Click Send for approval (top right). If something's missing, the header shows n issue; click it for the list. The Send estimate to [name] window has:
Send to — the customer, with Email and Text message ticks. If the customer has neither, add one here; it's saved on their profile.
Message — shown at the top of the estimate.
Before you send — the checks. A warning (Demo & base has no team yet, Margin is under target, a missing cost) doesn't stop the send; each has a fix beside it (Pick team, Review pricing, Show). A blocker (no items, a discount larger than what it applies to, a T&M phase with no rate) has to be fixed first.
Valid until — from Estimates valid for in Settings, with Change to pick another day. Due on approval is the deposit with its tax. [Name] will see sums it up: 2 phases · 1 optional.
Preview as [name] opens the customer's page exactly as they'll get it.
Click Send. The estimate becomes Rev 1, locked, and the customer gets a link by the channels you ticked. Texts honour customers who've opted out.

What the customer sees
The link opens the estimate on any phone or computer, no account needed: your business name and logo, Estimate · Rev 1 · Valid until …, the project name and address, your message, then The work, in n phases with each phase's one-line summary and price (Show details lists the items and quantities, never a price per line). A T&M phase reads Billed at actual hours, $65.00 per hour, about 10 h estimated. Optional items have a tick box; ticking one updates the total and the payments. Then the Payment schedule, Total, and Deposit due on approval, with the line Approving locks this price. Changes after that come as a change order you approve separately.
Ask a question sends a message to your project's activity and to the estimator. Approve & sign opens the signing sheet: a summary, Signature (Type their name or Draw it), I agree to the scope and payment schedule in Rev 1., and the deposit. With Stripe connected they can Pay [amount] now by card or bank transfer, or Pay later and get the invoice by email. The button reads Approve & pay [amount] or Approve.
After signing they see Approved – thanks, [name], View the signed copy, and Pay deposit · [amount], and a signed copy is emailed to both of you.

Customers see prices only. Your costs, markup, and margin stay in the office. To look at the page yourself, click Preview in the builder's ⋯ menu, or Preview as [name] on the project page; Copy customer link copies the link.
While it's out
The project moves to Waiting on customer on the Estimates tab. Its status shows Not opened yet or Sent · viewed 2×, and the row offers Nudge when it hasn't been opened in three days. On the project page the main button is Mark approved, and its arrow menu has Resend to [name], Revise estimate → Rev 2, Extend expiry (once it's expired), Mark lost…, and Create follow-up estimate.
Revise. Click Revise estimate → Rev 2. You get a draft you can change and send; the customer keeps seeing Rev 1 until you send Rev 2, and then their old link reads This version was replaced with a link to the new one.
Resend. The same link goes out again with a message, by email, text, or both.
Expired. After the valid-until day the customer's link turns read-only with Ask for a new date. Extend expiry picks a new Valid until day and the same link works again.
Mark lost. Pick at least one reason (Price too high, Timing, Went with a competitor, No response, Changed their mind, Other), add Details, and set Check back on to be reminded. The customer's link stops working. A lost estimate stays on the Estimates tab for 30 days and under All after that; Reopen brings it back as the next revision.
4. Approve for the customer
When the customer said yes on paper, by email, or on the phone, click Mark approved on the project page (or in the builder). The window records how:
Recorded outside the app — Signed contract (with Attach signed contract for a photo of it), Email reply, or Verbal.
Project manager — who Gets the handoff: the estimator unless you change it.
Payment schedule — the agreed one. Start from a preset (25/50/25, 30/40/30, 50/50, 100%), drag the bar or type each payment's percentage, pick when each is due (On approval, When [phase] is reviewed, At closeout, or Days after closeout (retainage)), and add a step with +, up to six. The amounts update as you go. See Deposits, progress payments, and retainage.
Note — for the project's activity.
What happens next spells it out: the revision locks, the deposit is emailed with a pay link, and the hours go to the Backlog until you schedule them.
Click Approve & hand off. It counts exactly like a customer signature, with the source recorded on the project.

After approval
Whichever way it was approved:
The estimate revision is locked. Every change from now on is a change order.
The deposit invoice goes out by email with a pay link, as the first step of the payment schedule (unless the project is under your Skip the deposit under amount).
The project moves to Approved · not scheduled and shows in the Backlog. Each phase is ready to be given a team and a start day.
The project page's Documents list the signed estimate (Signed Oct 19 · viewed 1×) and the deposit invoice.
Pencilled-in dates
Before the customer approves, you can Pencil in dates on the schedule strip at the bottom of the project page: pick the Team and the Start, and the days hold that team's hours in the Backlog's capacity (not on Dispatch or the Calendar). When the customer signs, the project page asks whether to Schedule these dates or Let them go. When you mark it approved yourself, the window has Turn the pencilled-in dates into the schedule, ticked, with Text the customer the start date under it.
Duplicate or delete
⋯ → Duplicate in the builder (or Duplicate on a cancelled project) copies the estimate as a new draft. In the Duplicate project window keep The same customer or pick another (then no property, reference, or PO is copied), set the Project name and Reference (optional), and click Create estimate. Create follow-up estimate on a closed or lost project does the same for that customer.
⋯ → Delete project removes a draft that was never sent. Sent estimates are marked lost instead.