Schedule and Dispatch Install
Give each phase a team and a start day, read the Backlog's capacity, move days on the schedule strip, run the day from Dispatch → Install, handle rain and holds, and order the materials the scheduled
Once a project is approved, its phases wait in the Backlog until each one has a team and a start day. Scheduling puts the phase on Dispatch → Install and on the crew's Today, and texts the customer the start date.
The Backlog
Open Projects → Backlog. The strip at the top is Install capacity: for each install team, the hours booked against the hours available for this week and the next two (13/45, 0/75), how many hours each team has free over the three weeks, and whether the unscheduled work Fits in the next 3 weeks or Won't fit before a date. Only teams with Takes install work count, unless you tick Count route teams in capacity under Filter.
Below, every approved project with unscheduled phases: the Unscheduled phases (1 of 2 · Planting, or CO-1 only · Patio drain), their Hours, when it was Approved and how long it's been waiting, the Deposit (Paid, Invoiced, Not requested, or Not required), the Contract, and the Sold margin. Projects sit under Ready to schedule or Waiting on deposit. Hover a row for Schedule, or Remind on an unpaid deposit.

Schedule a phase
Click Schedule on a phase row (or the main button, Schedule French drain, or Not scheduled – pick team & start day on the schedule strip). The window shows the phase's hours budget and:
Team — the phase's planned team, with how many people are rostered. Change team size uses a different number for the day count. Add another team splits the hours between teams; type the hours for each.
Start day — the team's first free day, or pick another.
The days — how many days it takes and the maths behind it: 5.33 h ÷ (2 × 7.5 h) = 0.36 → 1 day. Each day shows Free, the hours of this phase on it (5.3h, with the rest of the day open), or Booked. Weekends and non-working days are skipped.
Chain next phases on this team — the following phases start right after this one on the same team (Regrade & seed (T&M) would start Mon 2 on Install A).
Text [name] the start date — on by default. The customer gets one text with the start date, and another only if the date moves.
The footer says where it lands: Shows on Dispatch for Lena from Fri 30.
Click Schedule. The phase turns Scheduled, the days appear on the strip and on Dispatch → Install, and the lead gets a push.

When the team is already booked, the start day turns amber and the window offers ways out: Next free start, Start after [the clashing phase], Use [another team] – free [day], or Double-book anyway. Double-booking is allowed; it's logged on the project.
An unpaid deposit only warns, unless Require deposit before scheduling is on in Settings. Then the window is blocked, with Schedule before the deposit is paid for admins, which is logged.
A T&M phase schedules on its estimated hours and says so: Estimate only – billed on punched hours × $65.00/h.
The schedule strip (Gantt)
The strip along the bottom of the project page is the project's calendar: a row per phase, a column per working day, today in red. Toggle it with the Gantt button in the header. Each bar shows the phase's status and hours (70% declared Tue · 63 h/41.67 h, Scheduled · 20 h, Reviewed), with Rain and Resumes · 15 h left blocks for held days, and a red stretch when the days ran past the plan.
Drag a bar to move the phase; drag either end to stretch or shrink it (the hours budget stays, the days change). Shrinking below the hours already worked asks first and never deletes a day with hours on it.
Moving a phase that later phases depend on asks Finish grade & seed is on Mon 28 – shift it 1 day? with Shift them too or Keep dates. Moving the first phase asks whether to Move and text the customer or Move, don't text.
Click a bar for the same choices as the schedule window: Move, Change days, Add a day, Rain day, Release days, Hold the day.
Keyboard: focus a bar, then ← / → moves it a day, and Enter saves.
Phases run over all the time. When a team clocks out with a fixed-price phase under 100 %, Shortcut adds a day on that team's next working day with room (Day 4 of 3), and asks about the phases behind it. A day you release is never added back. T&M phases, and phases with no room in the next two weeks, are handed to you instead: the activity reads left an unfinished phase for the office to plan, and you add the day yourself.
A finished phase with a day still booked shows Steps & edging is complete – 1 day is still planned with Keep days or Release the day, so the team's day frees up on Dispatch.
Dispatch → Install
Dispatch has two scopes. Maintenance is the route board you know; Install is project work. Switch with the Maintenance (n) | Install (n) control under the title; Dispatch remembers which you used. A route team pulled onto a project shows On install · [project] on its row in Maintenance, with Switch to Install.
Today lists each team with install work (Install A · Lena, Cal · 2 projects today), and for each project: the customer and address, Today (Phase day 5 of 5 · Patio & seat wall, or Punch list), Hours · measured against the budget (red when over), Declared (70% · Tue), and the Status. Click a row to open the project. Filter by Status or Team, or search.

This week is a grid: teams as rows, working days as columns, one bar per phase day (Phase day 3 of 5 · 56/63.34 h, Retaining wall rebuild · Wall · 70% declared), and under each cell the hours booked against the team's capacity (15 / 15 h, 5.3 / 15 h). Along the bottom, Unscheduled holds every phase without days as a chip (CO-1 · Backyard patio & seat wall · Patio drain · 6 h, Side yard drainage · 2 phases · ≈ 11.33 h · approved Oct 19). Drag a chip onto a team's day to schedule it there (the schedule window opens, filled in), or drag a bar's end to stretch it. Open Backlog goes to the Backlog tab. A chip waiting on its deposit can't be dragged until it's paid.

Holds, rain days, and moving days
Rain day. On Dispatch → Install, click Rain day. The Rain day · [date] window lists every team with project work that day; tick the ones that are rained out (a lead who tapped Rained out on their phone is pre-ticked, Suggested by Marco). Shift later phases moves each project's later phases on that team along, and Text customers tells the affected customers the new start. Click Mark n teams rained out. The held days show Rain on the strip, and the team's work moves to its next free day.
Put a phase on hold. On the phase's ⋯ menu choose Put on hold…. Pick the Reason (Waiting on material, Customer asked, Weather, Inspection, Other), the Team (on a phase with several teams, one team or Every team (whole phase)), the Resume day, and whether to Text [name] the new start. The held days come off Dispatch, the remaining hours move to the team's first day back (the window shows where), and the lead sees it on their app. Resume brings it back. A whole project is held from the main button's arrow, Put project on hold….

Move or release days. From the phase's ⋯ → Reschedule or change team (or by clicking its bar), choose Move (a new start, with Move this team's later phases along), Change days, Add a day (one more day like the others, or Double-book anyway), or Release days (Upcoming days, Past days nobody worked, or Both; their hours go back to the Backlog, and worked days always stay).
Calendar
Scheduled phases also show on the Calendar as read-only all-day bars per team. Click one to open the project.
Materials to buy
Reports → Materials to Buy adds up what the scheduled phases need, so you can order before the crew needs it. Under Include, tick Projects (phases scheduled in the period), Maintenance products (products on maintenance visits), and, if you like, Unsigned change orders (phases on change orders the customer hasn't signed yet).
Each item shows what's To buy, its Est. cost, when it's First needed, and what it's For (2 projects). A part of a bundle is marked From bundle. To buy is what each scheduled phase estimates minus what the crew has already marked as used on their checklist; a phase counts once, in full, on its next work day, and the cost is today's price book cost. Open Materials to buy from the ⋯ menu on the Projects list, or from Reports. See Reports for periods, saved views, and scheduling the report by email.