# Settings and the Price book

Turn Projects on, set your sales tax rates, deposit rules, working week, default payment schedule and warranty, mark which teams take install work, and build the price book your estimates draw from.

Everything a project needs to price and schedule itself is set once, in two places: **Settings → Operations → Projects** for the rules, and the **Price book** for what you sell. Only company admins can change either.

## Settings → Operations → Projects

Open **Settings → Operations → Projects** (click your name at the bottom-left of the sidebar, then **Settings**). [Open Projects settings →](https://shortcutco.com/settings/projects)

<figure><img src="https://2299783971-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FOhi7KtJ4vY1pDKwWu5SV%2Fuploads%2Fgit-blob-5a119a0b8e78a7588b3b02f540daffe18c004f95%2Fprojects-settings.png?alt=media" alt="Settings → Operations → Projects: the Enabled switch at the top right, then rows for Sales tax with IN · 7% default and KY · 6%, Deposit, Require deposit before scheduling, Show teams budgeted hours, Working week Mon – Fri 8 h per person, Default payment schedule 25 / 50 / 25, Estimates valid for 30 days, Change orders valid for 14 days and Default T&#x26;M rate"><figcaption><p>The Projects settings: tax, deposits, the working week, and the default payment schedule.</p></figcaption></figure>

At the top right, the switch next to **Enabled** turns Projects on or off for your company. It starts on. Turning it off makes everything read-only: existing projects stay readable, invoices stay payable, and customer links keep working, but nothing new can be created or sent. The switch is the way back on.

| Row                                   | What it does                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    |
| ------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| **Sales tax**                         | The rates you charge, as pills like **IN · 7%**, with one marked **default**. Each new project starts on the default rate, and the rate is printed on the estimate and invoices. Tax applies to taxable lines only, on top of the price. Click **Manage** to add a rate (**Label** and the percentage, then **Add rate**), **Make default**, or **Archive** one. The same window has **New items are taxable**: whether a new price book item starts taxable. Labor is never taxed from the price book; a T\&M phase decides its own labor tax. |
| **Deposit**                           | The deposit is invoiced the moment the customer approves, as the first step of the payment schedule. Turn on **Skip small deposits** and set **Skip the deposit under** an amount to leave the deposit off small jobs. With it off, the row reads **Never**: every project gets a deposit.                                                                                                                                                                                                                                                      |
| **Require deposit before scheduling** | Off: an unpaid deposit only warns when you schedule. On: the project can't be scheduled until the deposit is paid (an admin can still choose **Schedule before the deposit is paid**, and that's logged on the project).                                                                                                                                                                                                                                                                                                                        |
| **Show teams budgeted hours**         | On, with a percentage: the crew sees a reduced budget on their phone, so a 28-hour phase shows as 22 hours at 20 %. The office always sees the real budget. Off: teams see the same hours as you.                                                                                                                                                                                                                                                                                                                                               |
| **Working week**                      | The days your crews work (**Mon – Fri** by default) and the productive hours per person per day (**8 h**). Estimates use them for the *\~days* on each phase, and scheduling uses them to work out how many days a phase takes. A team can have its own hours per day under **Settings → Workspace → Teams**. It's the same working week and hours as **Settings → Operations → Scheduling & jobs → Team capacity**; changing one changes the other.                                                                                            |
| **Default payment schedule**          | How a fixed-price contract is split: **25 / 50 / 25** (deposit on approval, progress after phase 2 is reviewed, balance at closeout), **30 / 40 / 30**, **50 / 50**, or **100** (**Payment in full** at closeout). You can change it on each project when you mark it approved.                                                                                                                                                                                                                                                                 |
| **Estimates valid for**               | How long the customer's estimate link stays open, **30 days** by default. After that it turns read-only with **Ask for a new date**.                                                                                                                                                                                                                                                                                                                                                                                                            |
| **Change orders valid for**           | The same for change orders, **14 days** by default, after which the link reads **Ask to resend**.                                                                                                                                                                                                                                                                                                                                                                                                                                               |
| **Default T\&M rate**                 | The hourly rate a fixed change order's hours bill at when you convert it to time and materials.                                                                                                                                                                                                                                                                                                                                                                                                                                                 |
| **Warranty**                          | **12 months** by default. It starts the day you close out the project and is printed on the final invoice and the closed project. Reopening a project never resets it.                                                                                                                                                                                                                                                                                                                                                                          |

Typed amounts (the deposit threshold, hours per day, validity days, the T\&M rate, the warranty) save with **Save** at the bottom of the card. The switches and menus save as you change them.

### The Price book card

Under the settings, the **Price book** card shows **Your catalog** (how many items, in your order), **Last import** (the file and date of the last sheet you imported, with **Import**), and **Cost model**, which reads **Complete** or names what's missing, like *Overhead recovery missing*. The cost model (loaded labor rates, equipment rates, overhead recovery, and target margin) lives in [Costs](https://docs.shortcutco.com/readme/costs-and-profitability.md); the price book reads it to cost labor.

## Teams that take install work

Project days are scheduled on **install teams**. Open **Settings → Workspace → Teams**. For each team that builds projects, open its **⋯** menu, click **Team settings…**, and in the window:

* **Takes install work** — turn it on. The team then shows on project schedules and on **Dispatch → Install**, and its row reads **Install**.
* **Lead** — the person who declares progress and sends phases for review from the field. Add people to the team first.
* **Hours per day** — the company default, or a number per person for this team only (**Use default** goes back).

Click **Save**.

Teams without the flag can still be picked for a phase; they just don't count in the Backlog's install capacity unless you tick **Count route teams in capacity** there. See [Users and Teams](https://docs.shortcutco.com/readme/configuration/workforce-users-+-roles-+-teams.md#teams).

## The Price book

The price book is your catalog for projects: every material, labor item, piece of equipment, and bundle you quote, with its cost, markup, and selling price. Estimates, the crew's checklist, Materials to Buy, and the closeout all read from it. Open it from the Price book card in Settings → Projects, or from **⋯ → Price book** at the top of the Projects list. [Open the Price book →](https://shortcutco.com/settings/projects/price-book)

<figure><img src="https://2299783971-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FOhi7KtJ4vY1pDKwWu5SV%2Fuploads%2Fgit-blob-dc197f49e92595ff465bdaa088beb53e72e6d3b2%2Fprojects-price-book.png?alt=media" alt="The Price book: categories on the left (All, Aggregates &#x26; base, Hardscape with Pavers under it, Plants &#x26; soil, Equipment rental, Labor) and a grid of items with Checklist and Taxable switches, Unit, Rate (h/unit), Cost, Markup and Sell columns, plus Problems, Import and New item at the top"><figcaption><p>The price book is a grid you edit in place. Categories keep the order your crews see on their checklist.</p></figcaption></figure>

### Categories

Categories are the left column: **All**, then yours, with subcategories indented under their parent. Click **Add a category** at the bottom to add one; on a category's menu choose **Rename**, **Add subcategory**, **Move up**, **Move down**, **Retire**, or **Delete** (an empty category only). You can also drag them into order.

The order here is the order your crews see on their checklist and the order the closeout lists materials in. Shortcut never re-sorts it.

### Items

Each row is one item. Click a cell to edit it; **Tab** and the arrow keys move between cells, **Enter** edits, and **Esc** cancels. The top of the page shows **Saved · you, just now**, **Saving…**, or **Not saved** so you know where you stand.

| Column            | What it is                                                                                                                                                                                                                               |
| ----------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| **Item**          | The name. An item with no name shows **Needs a name**.                                                                                                                                                                                   |
| **Checklist**     | On: the crew sees this item on their phase checklist, with the estimated quantity, and records what they used. Off: the item is priced but never listed for the crew.                                                                    |
| **Taxable**       | Whether sales tax applies to this item. New items follow the **New items are taxable** setting.                                                                                                                                          |
| **Unit**          | Free text, up to 12 characters: *tn*, *cy*, *sf*, *ea*, *bag*, *h*.                                                                                                                                                                      |
| **Rate (h/unit)** | Labor items only: how many hours one unit takes. A labor item priced in hours needs no rate; one in any other unit without a rate is flagged **Labor without a rate**. Labor cost comes from your cost model's labor rate, set in Costs. |
| **Cost**          | What one unit costs you.                                                                                                                                                                                                                 |
| **Markup**        | The percentage on top of cost.                                                                                                                                                                                                           |
| **Sell**          | The price per unit. It follows from cost × markup unless you type a price; then the markup adjusts to match. **Price from cost × markup** in the row menu recomputes it.                                                                 |

Click **New item** to add a row to the category you're in. A row's **⋯** menu offers **History** (every cost, markup, and sell change), **Change category**, **Kind**, **Move up**, **Move down**, **Retire**, and **Delete item**. **Browse n projects** on an item opens the Projects list filtered to the projects that use it.

Tick several rows and a bar appears along the bottom with **Set markup**, **Checklist** (**Show on checklist** / **Hide from checklist**), **Taxable** / **Not taxable**, **Move to…**, and **Retire**.

**Problems (n)** at the top filters to items that need attention: a missing name, unit, or cost, or labor without a rate. **Retired (n)** lists items you've retired; they stay out of pickers until you **Restore** them.

### Bundles

A bundle is one item made of parts: *Paver patio, installed* might be base stone, bedding sand, pavers, polymeric sand, and the labor to lay them, each with a quantity per square foot. A bundle's cost and sell are the sum of its parts, and its labor hours come from its labor parts. On an estimate a bundle adds one line; on the crew's checklist, the parts marked **Checklist** are listed separately with their own quantities.

Bundles live in each category under **Saved bundles**. Click **Show parts** on a bundle row to see and change its parts, or **Add a part** and type to search the price book. A bundle can't contain another bundle. Retiring an item that bundles use warns you and lists them.

### Import a sheet

Click **Import** to bring a CSV, TSV, or .xlsx file in. Drop the file on **Drop a CSV, TSV or .xlsx file here** or click **Choose file**. Shortcut reads the headers it recognises (name, category, unit, cost, markup or sell, taxable, checklist, rate) and shows **Rows to import**, what's **New** and what's an **Update**, and **Import notes** for anything it couldn't read. Rows keep the file's order. Rows without a name land as **Needs a name** so nothing is dropped silently. Click **Import n rows**.

{% hint style="info" %}
Changing a price book item never changes an estimate that's already been sent or signed, or a change order. Draft estimates show **Price book changed** on the affected line so you can refresh it with one click.